Insulation, ventilation, shading and delivery planning all shape how social homes, and the people who work on them, cope with prolonged heat.
At a Glance
Retrofit that plans only for winter warmth leaves summer overheating unaddressed, and air conditioning shifts the problem onto residents as a new running cost.
Insurance exposure, flood risk and homes not built for higher temperatures, such as BISF stock, do not always appear in business cases for retrofit or climate resilience.
Prolonged heat now affects delivery: render and mortar have working temperature limits, no upper temperature limit applies to workforces, and summer heat contingency has not previously been part of programme planning.
Retrofit programmes have centred on keeping homes warm, which leaves summer performance out of the specification. Insulation slows the transfer of heat in both directions. In a home that is already overheating it retains that heat, but where ventilation, shading and resident behaviour are understood, the same insulation can help keep a home cooler.
Awaab’s Law and the recognition of overheating as a risk have sharpened the focus of many providers. The task now is to link retrofit and EPC C delivery with climate risk and climate resilience.
Cooling is the usual response to overheating, but air conditioning adds a running cost for residents who are already managing energy bills.
Insurance adds a second pressure. More homes are expected to fall within flood risk areas, and some stock was not built for current temperatures, including BISF homes. These costs do not always feature in business cases for climate resilience or retrofit. Where homes being built or managed cannot be insured, the result is a liability that providers must manage.
Heat also affects how work is delivered. Heat related train cancellations in Manchester this summer raised the question of which deliveries and resident appointments were being disrupted in the same way. Where appointments move, adaptations, repairs and overheating support are delayed. Render and mortar are applied within set temperature ranges, often lower than those reached this summer. No upper temperature limit applies to workforces, and contingency for summer heat has not previously been part of planning for planned works, repairs, retrofit or new homes.
A home works as a system for shelter, warmth and ventilation, and assessing how each measure interacts with the others before work begins reduces the risk of unintended effects. What works in a bungalow may not work in a block of flats, so sharing results between providers, including what did not work, allows practice to transfer between similar property types. Work that is intrusive and disruptive also needs clear communication about the benefit to residents personally.
Cold homes and overheated homes carry different health risks, and retrofit planning needs to address both.
Practical steps for housing providers
Assess summer performance alongside winter performance when specifying insulation, glazing and ventilation for each property type.
Explain to residents what the work involves and how it benefits them, and give guidance on using ventilation and shading to manage heat.
Before proposing cooling as a response to overheating, consider the running cost for residents.
Include insurance exposure, flood risk and stock not built for higher temperatures in business cases for retrofit and resilience work.
Check the working temperature limits of materials such as render and mortar, and build summer heat contingency into programmes.
Set out how workforce wellbeing and working hours will be managed during prolonged heat.
Share results with other providers on similar property types, including measures that did not perform as expected.
Host and guest
Guest: Ruth Dent, Chief Experience Officer, RE:GEN Group
Host: Andy Cameron-Smith, Communications and Partnerships Director, Healthy Homes Hub